
COMPLETED CONSTRUCTION
Confidential Warehouse
This project features the ground-up construction of a 48,805 SF pre-engineered metal building, complemented by a 17,911 SF attached canopy designed to support high-volume operational needs. The facility includes a fully equipped warehouse with truck docking, flexible office space, and a dedicated van launch area to streamline logistics and daily workflows.
Beyond the building itself, the team delivered comprehensive development across the 11.7-acre site, including two new parking lots, a septic system, and a retention area to support long-term functionality and sustainability. Significant offsite infrastructure improvements were also completed, such as widening two I-40 off-ramps and constructing new turn lanes, including one off Route 66, to enhance accessibility and improve traffic flow to and from the facility.

Watch this industrial project in Flagstaff come to life from the sky!
View the evolution of a PEMB shell and 17,911 SF attached canopy, built to support warehouse operations, truck docking, office space, and a dedicated van launch area. Beyond the building itself, this project transformed 11 acres with new parking lots, a septic system, retention area, and key infrastructure improvements.
Proud of the teamwork, precision, and collaboration that brought this site from raw land to a fully functioning operation on a compressed schedule!
SNOW ON THE JOB SITE
Discover our recently completed shell construction project in snowy Flagstaff. This pre-engineered metal building showcased our expertise in navigating challenging winter conditions. Our team brought the structure to life, working seamlessly through snowfall to deliver exceptional results.



































